Standard Operating Procedure for Operation and Cleaning of Auto Coater – Automatic Coating Machine used for Tablet Coating during manufacturing of pharmaceutical solid dosages form.
Auto Coater – Automatic Coating Machine
1.0 Objective :
-
- To lay down the procedure for cleaning and operation of Auto Coater- Automatic Coating Machine.
2.0 Scope :
-
- This SOP is applicable in Tablet Manufacturing Area for different types of coating through Auto Coater- Automatic Coating Machine.
3.0 Responsibility :
-
- Production Operator : To follow the Operation and cleaning procedure.
-
- QA : To Check and verify the operation and cleaning procedure.
4.0 Procedure for Cleaning of Auto Coater- Automatic Coating Machine :
-
-
Product change over (Type A) – Auto Coater :
-
-
- Affix the (To be clean status label) in area and equipment.
-
- After enteric coated activity 20% NaOH solution shall be used for cleaning purpose.
-
- Fill the vessel with potable water and start the pneumatic stirrer.
-
- Open the outlet valve of the S.S. vessel.
-
- Remove the nozzle caps of the spray gun of Auto Coater.
-
- Place 50 kg capacity polybag to collect the water from the spray gun.
-
- Press the spray key to allow the water to pass through the flexible hose and spray gun.
-
- Repeat the process twice and drain the water.
-
- Stop the pneumatic stirrer by closing the compressed air valve.
-
- Scrub the S.S. vessel with the help of nylon brush.
-
- Wash with sufficient potable water.
-
- Rinse the S.S vessel with sufficient purified water.
-
- Dry the S.S. vessel with a dry lint free cloth.
-
- Fill the vessel with 1 liter Isopropyl Alcohol.
-
- Press the spray key to allow the Isopropyl Alcohol to pass through the flexible hose and spray gun of Auto Coater.
-
-
Cover the control panel with a polybag.
-
-
- Open the side covers of the inlet and exhaust ducts.
-
- Connect the Inlet valve of the potable water to the cleaning bar.
-
- Open the drain valve of the Machine.
-
- Remove the exhaust hood from the pan by loosing the clamps of Auto Coater..
-
- Switch “ON” the supply by releasing the red button (Emergency button) provided on the panel.
-
- Press “LOG IN” and enter the User name and password.
-
- Press the green switch to put “ON” the control panel
-
- Select the disable button to start the WIP system.
-
- Press start button to run the rinsing cycle of Auto Coater..
-
- Ensure the “RPM” of the pan is kept between 2-5.
-
- After 15 minutes, stop the WIP system and switch ON the WIP drain to release water.
-
- Clean the Pan with potable water and a soft nylon scrubber.
-
-
Rinse the Pan with sufficient purified water.
-
-
- Clean the exhaust hood with sufficient potable water.
-
- Rinse with sufficient purified water.
-
- Clean the outer surface and top surface using a wet lint free cloth and dry it with a dry lint free cloth.
-
- Check the cleanliness of the Auto Coater pan visually.
-
- Fix the exhaust hood with the help of clamps.
-
- Intimate to QA to take the swab sample and send it to QC along with duly filled & signed Swab Test Intimation Slip / Analysis Report.
-
- After analysis QC chemist shall enter the details in “Swab Test Intimation Slip / Analysis Report” and send back to production.
-
- If the report is OK then put the status label cleaned.
-
- If the report is not OK then repeat the above procedure.
-
- Close the side covers of the Inlet and exhaust ducts by locking the 2 clamps.
-
- Put “ON” the blower in the manual mode of Auto Coater, and dry the pan at 80°C for 15 minutes.
-
- Disconnect the inlet of potable water supply to the machine.
-
- Close the drain valve of Auto Coater..
-
- Clean the area.
-
- Enter the details in the Equipment log.
-
- Validity: 72 Hours.
-
- After validity period before start next process, clean the equipment.
-
-
Batch change over (Type B) -Auto Coater:
-
-
- Change the status of area & equipment.
-
- Fill the vessel with potable water and start the pneumatic stirrer.
-
- Open the outlet valve of the stainless steel vessel.
-
- Remove the nozzle caps of the spray gun.
-
- Place 50kg capacity polybag to collect the water from the spray gun.
-
- Press the spray key to allow the water to pass through the flexible hose and spray gun.
-
- Repeat the process twice and drain the water.
-
- Stop the pneumatic stirrer by closing the compressed air valve.
-
- Rinse the S.S vessel with potable water followed by purified water.
-
- Dry the S.S. vessel with a dry lint free cloth.
-
- Clean the inside & outside surface of the machine with a dry lint free cloth.
-
- If the processing of next batch takes more than 48 hours then clean the equipment following point (Type A cleaning).
-
- Enter the details in Equipment Log.
-
Operation of Auto Coater.
-
- Ensure that the Auto Coater is clean and status label is affixed on the Auto Coater.
-
- Make sure the proper working of HVAC system by checking the pressure difference of area & temperature and RH.
-
- Ensure that the workmen are properly gowned using snood and hand gloves.
-
- Get the line clearance from QA chemist before starting the operation.
-
- Start the process as per instruction given in BMR.
-
- Switch ON the supply by releasing red button (Emergency button) provided on panel.
-
- Press Log in and enter User Name and password.
-
- Main Screen shall be displayed.
-
- Click on the above Screen to log in.
-
- Enter User and Password Details.
-
- Overview Screen shall be displayed. Auto mode and Manual mode Shall be displayed.
-
- Select AUTO MODE in overview Screen.
-
- Select other option for arm seal and door seal.
-
- Then select Parameter and enter the details.
-
- Parameter screen shall be displayed, enter Batch details and select NEXT to go to General Parameters.
-
- Enter General Parameter Details and select NEXT to go to Pre Jog Parameters Screen
-
- Provide details in General Parameters and Pre Jog Parameters and select NEXT to go to Doshing Screen
-
- Enter details in Doshing and select NEXT To go to Post Jog Parameters.
-
- Enter details of Post Jog Parameters and select NEXT
-
- Select main screen and enter Start to run the coating process.
-
-
Select MANUAL MODE from Overview Screen.
-
-
- Manual mode screen shall be displayed, enter other option for arm seal and door seal.
-
- For arm seal and door seal. Select Arm seal and door seal and enter main screen of Manual Mode
-
- Select Parameters from Manual Screen and enter User and Password.
-
- Parameter screen shall be displayed, Enter details in Temperature Parameters and select NEXT
-
- Enter Details in parameters and select NEXT.
-
- Enter Details in Parameters and select NEXT
-
- Manual mode screen shall be displayed
-
- Finally click on various screen icon for adjusting settings to run the coating machine in manual mode.
-
- Enter the details in BMR and in Equipment Log Sheet.
5.0 Annexure of Auto Coater :
Annexure-I: Cleaning check list of Auto Coater.
Previous Product Name……………………. Batch No……………………..
Sr. No | Check Points | |
1.0 |
Dismantling: | |
|
||
2.0 |
Cleaning: | |
|
3.0 |
Visual Inspection or checkpoints: | ||
Part Name | Cleaning status |
|
|
Materials charging window | Cleaned / Not Cleaned | ||
Coating pan | Cleaned / Not Cleaned | ||
Baffles | Cleaned / Not Cleaned | ||
Exhaust Duct, Inlet and Outlet Duct | Cleaned / Not Cleaned | ||
Silicon tube | Cleaned / Not Cleaned | ||
Gun assembly | Cleaned / Not Cleaned | ||
Bed Sensor | Cleaned / Not Cleaned | ||
Intactness of gaskets | Cleaned / Not Cleaned /NA | ||
Loosen nut /bolt | Yes / No/ NA | ||
4.0 |
Reassembly: | ||
|
|||
5.0 |
Cleaning of surrounding area: | ||
Checked by :Production chemist | |||
Verified By : QA / Remarks if any :- |
***************************************END***************************************